<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: Plan to repave Route 9 doesn&#8217;t include Southborough</title>
	<atom:link href="http://www.mysouthborough.com/2009/11/03/plan-to-repave-route-9-doesnt-include-southborough/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.mysouthborough.com/2009/11/03/plan-to-repave-route-9-doesnt-include-southborough/</link>
	<description>News and events in Southborough, MA</description>
	<lastBuildDate>Sat, 11 Feb 2012 03:41:54 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.2.1</generator>
	<item>
		<title>By: Kelly Roney</title>
		<link>http://www.mysouthborough.com/2009/11/03/plan-to-repave-route-9-doesnt-include-southborough/#comment-10518</link>
		<dc:creator>Kelly Roney</dc:creator>
		<pubDate>Mon, 23 Nov 2009 16:31:55 +0000</pubDate>
		<guid isPermaLink="false">http://www.mysouthborough.com/?p=11670#comment-10518</guid>
		<description>Amazing!  Both the parts I wanted fixed have been repaved.  I should post here more often!</description>
		<content:encoded><![CDATA[<p>Amazing!  Both the parts I wanted fixed have been repaved.  I should post here more often!</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Kelly Roney</title>
		<link>http://www.mysouthborough.com/2009/11/03/plan-to-repave-route-9-doesnt-include-southborough/#comment-9187</link>
		<dc:creator>Kelly Roney</dc:creator>
		<pubDate>Thu, 05 Nov 2009 17:33:47 +0000</pubDate>
		<guid isPermaLink="false">http://www.mysouthborough.com/?p=11670#comment-9187</guid>
		<description>Stimulus money doesn&#039;t have to be spent on repaving.  It&#039;s just that this one project is a repaving project.  Repaving is fast out of the chute and thus good for stimulus.

Frankly, I think the pavement on Rte. 9 in Southborough is in pretty good shape except for the eastbound right turn lane past White&#039;s Corner.

I&#039;d like to see some work done on the bridge over Rte. 9 at Crossing Blvd. in Framingham.  (But I really think it&#039;s a bad design.)</description>
		<content:encoded><![CDATA[<p>Stimulus money doesn&#8217;t have to be spent on repaving.  It&#8217;s just that this one project is a repaving project.  Repaving is fast out of the chute and thus good for stimulus.</p>
<p>Frankly, I think the pavement on Rte. 9 in Southborough is in pretty good shape except for the eastbound right turn lane past White&#8217;s Corner.</p>
<p>I&#8217;d like to see some work done on the bridge over Rte. 9 at Crossing Blvd. in Framingham.  (But I really think it&#8217;s a bad design.)</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Chris</title>
		<link>http://www.mysouthborough.com/2009/11/03/plan-to-repave-route-9-doesnt-include-southborough/#comment-9103</link>
		<dc:creator>Chris</dc:creator>
		<pubDate>Wed, 04 Nov 2009 13:26:22 +0000</pubDate>
		<guid isPermaLink="false">http://www.mysouthborough.com/?p=11670#comment-9103</guid>
		<description>LOL, maybe they should just take the money and speed up that work in front of Whole Foods, seems like it&#039;s been torn up forever!</description>
		<content:encoded><![CDATA[<p>LOL, maybe they should just take the money and speed up that work in front of Whole Foods, seems like it&#8217;s been torn up forever!</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: minimom</title>
		<link>http://www.mysouthborough.com/2009/11/03/plan-to-repave-route-9-doesnt-include-southborough/#comment-9094</link>
		<dc:creator>minimom</dc:creator>
		<pubDate>Wed, 04 Nov 2009 11:46:29 +0000</pubDate>
		<guid isPermaLink="false">http://www.mysouthborough.com/?p=11670#comment-9094</guid>
		<description>I think Route 9 southborough is fine.   I don&#039;t really want them messing traffic up like they did FOREVER down at whole foods area.  It&#039;s bad enough at rush hour.   They can repave in 10 years when I move out west!!</description>
		<content:encoded><![CDATA[<p>I think Route 9 southborough is fine.   I don&#8217;t really want them messing traffic up like they did FOREVER down at whole foods area.  It&#8217;s bad enough at rush hour.   They can repave in 10 years when I move out west!!</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: dean dairy</title>
		<link>http://www.mysouthborough.com/2009/11/03/plan-to-repave-route-9-doesnt-include-southborough/#comment-9073</link>
		<dc:creator>dean dairy</dc:creator>
		<pubDate>Wed, 04 Nov 2009 04:55:50 +0000</pubDate>
		<guid isPermaLink="false">http://www.mysouthborough.com/?p=11670#comment-9073</guid>
		<description>Indeed.  What about road improvements other than “repaving”?

Why is the Rte. 9 spending constrained to “repaving” or not “repaving”?

As long as the average per mile project cost averages out, who cares?

Why the artificial constraint to spend the money on just “repaving” rather than more needed improvements?

Who benefits beside paving contractors?</description>
		<content:encoded><![CDATA[<p>Indeed.  What about road improvements other than “repaving”?</p>
<p>Why is the Rte. 9 spending constrained to “repaving” or not “repaving”?</p>
<p>As long as the average per mile project cost averages out, who cares?</p>
<p>Why the artificial constraint to spend the money on just “repaving” rather than more needed improvements?</p>
<p>Who benefits beside paving contractors?</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Chris</title>
		<link>http://www.mysouthborough.com/2009/11/03/plan-to-repave-route-9-doesnt-include-southborough/#comment-9060</link>
		<dc:creator>Chris</dc:creator>
		<pubDate>Wed, 04 Nov 2009 02:20:53 +0000</pubDate>
		<guid isPermaLink="false">http://www.mysouthborough.com/?p=11670#comment-9060</guid>
		<description>I wonder (hope) they&#039;ll fix the low spot just past the Country Club Lane light and apts on the right...in a decent rain it&#039;s always flooded.  That and the Rte. 126 &#039;overpass&#039;, meaning the roadway under it also floods very easily.</description>
		<content:encoded><![CDATA[<p>I wonder (hope) they&#8217;ll fix the low spot just past the Country Club Lane light and apts on the right&#8230;in a decent rain it&#8217;s always flooded.  That and the Rte. 126 &#8216;overpass&#8217;, meaning the roadway under it also floods very easily.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: John</title>
		<link>http://www.mysouthborough.com/2009/11/03/plan-to-repave-route-9-doesnt-include-southborough/#comment-9053</link>
		<dc:creator>John</dc:creator>
		<pubDate>Wed, 04 Nov 2009 00:36:46 +0000</pubDate>
		<guid isPermaLink="false">http://www.mysouthborough.com/?p=11670#comment-9053</guid>
		<description>Paving or plowing, the stretch of Route 9 from the Fayville lights to Route 495 seems to ALWAYS be on the bottom of the list as far as the state is concerned</description>
		<content:encoded><![CDATA[<p>Paving or plowing, the stretch of Route 9 from the Fayville lights to Route 495 seems to ALWAYS be on the bottom of the list as far as the state is concerned</p>
]]></content:encoded>
	</item>
</channel>
</rss>

